Regulatory Site Closure
- Designed and implemented a remediation strategy to remove lead contaminated soil from 3 contaminated water tower sites at Ft. Indiantown Gap, PA.
- Collected surface and subsurface soil samples and installed 10 groundwater monitoring wells for Site Characterization in accordance with Pennsylvania's Land Recycling Program (Act 2).
- Removed contaminated soil.
- Made presentation to PADEP and USACE following the Site Characterization, Leachability Study, and Additional Site Characterization.
- Achieved Regulatory Closure of the Three Water Tower Sites.